Installation and Test Procedure Overview
|
Use these test procedures for stand-alone RVP installations. For Vaisala weather radar system installation, the necessary configurations are done in the factory. |
| Record all values when instructed. Save the values for future reference. |
| Customer | |
| Main Serial Number | |
| IFDR Serial Number | |
| Delivery Date | |
| Radar Mfg./Type | |
| Customer Engineer | |
| Vaisala Engineer |
These installation and test procedures are for Vaisala field engineers and customers installing and testing of RVP10 on a radar system.
Complete these procedures in the order described. Failure to perform one step may effect later tests.
Keep a copy of the test results either on file or with this manual. Do not write in this manual since it is replaced with an upgrade. Make a copy.
Sign-off on each test when it is complete. If a test does not pass, remedy the problem and repeat the test. If the test still does not pass, add a sheet to the test explaining the variance. A supplementary test sheet is at the end of the test procedure.
When you have successfully completed the installation and test procedures, your RVP10 is ready to connect to your software application, such as the Vaisala IRIS system. Perform the additional configuration and calibration procedures before using the RVP10 with the software.
Contact Vaisala technical support if you have problems or comments regarding this product or procedures.